top of page
BUILT FOR AI HYPERSCALE · FORNEY, TEXAS

Power rooms and racking, on a schedule that ships.

Switchgear, electrical enclosures, server racking, and structural steel for AI hyperscale data centers. Cut, formed, welded, coated, and assembled under one roof. 1 to 10 weeks while the OEMs quote 44 to 70.

1 to 10 wks
Delivery Lead Time
44 to 70
OEM QUOTE WEEKS
120K sf
FACILITY (+80K BUILDING)
1 Day
DRIVING TO DFW CORRIDOR

ISO 9001 Quality System • UL 508A & 891 (In Process) • AWS D1.1 Certified Welding • NEMA Enclosure Standards • MBE + VBE Certified •

WHY HYPERSCALE BUYERS MOVE WORK TO SLM

Schedule is the product. Everything else is in service of it.

AI capacity is bottlenecked by power room steel, switchgear assembly, and racking. We move that bottleneck. Vertically integrated, no waiting on three vendors, no waiting on a paint shop, no waiting on a panel shop.

Lead Time Compression

1 to 10 weeks on switchgear sections and racking lineups. We protect critical-path schedule for owners staring down COD penalties.

One Roof, One Schedule

Laser cut, formed, welded, powder coated, panel built, and electrically tested in one building. No coordination tax. No "the coater is behind."

Texas Proximity

One driving day to every major Texas data center corridor. Site visits, JIT delivery windows, and field-fit modifications without waiting for a freight lane.

Spec-Aligned Build

Built to UL 508A and UL 891 construction standards. Hi-pot and megger tested. NEMA-rated enclosures. Documentation released with every shipment.

Supplier Diversity

MBE and VBE certified. Counts toward Tier 1 supplier diversity targets without sacrificing capability, capacity, or schedule discipline.

Real Engineering Support

Drawing review, design for manufacturability, and value engineering from the team that actually builds the work. Not a sales engineer reading a deck.

data-center-racks.png
AI DATA CENTERS & POWER infastructure
SWITCHGEAR & ELECTRICAL ENCLOSURES

Power room steel that ships when you need it.

Switchgear sections, electrical enclosures, control panel platforms, and structural steel for power rooms feeding 100 to 500+ MW campuses.

What We Build

Low-voltage switchgear sections to UL 508A construction

Medium-voltage switchgear enclosures to UL 891 construction

NEMA 1, 3R, 4, 4X, and 12 rated enclosures

Bus duct support structures and busway hangers

Control panel back panels and sub-assemblies

Outdoor power skids and modular power room sections

What We Test

Hi-pot and megger insulation resistance

Continuity and torque verification

Dimensional inspection on every section

Full documentation pack released with shipment

press-brake.png
Industrial & Commercial Fabrication
SERVER RACKING & STRUCTURAL STEEL

Racking, containment, and rack-adjacent steel.

From custom AI hyperscale frames to cable tray support steel, we build the steel that holds the compute load.

Racking Capabilities

Custom AI and hyperscale server rack frames

Hot aisle and cold aisle containment frames and panels

Cable tray ladder rack support structures

Overhead bus and busway support steel

Wall-mount and floor-mount cabinet enclosures

Co-location racking with custom badge and finish

Finish Options

Automated powder coat in any standard or custom color

Zinc plating, galvanizing, and anodizing through certified outside processors

Engraved or silkscreened labeling to spec

CAPACITY & EQUIPMENT
A real shop. Not a one-laser job shop.

120,000 square feet of production capacity in Forney, Texas, with another 80,000 square feet under construction. $7.3M+ in equipment chosen for hyperscale-grade throughput.

Cutting

Bystronic 15kW and BesCutter 20kW fiber lasers. Two BLM tube lasers running in parallel. Carbon, stainless, aluminum, and copper to 1 inch.

Forming

Press brakes from 40 to 400 tons. Panel bender. Turret punch. Tolerances to plus or minus 0.005 inch on repeat work.

Welding

AWS D1.1 certified MIG, TIG, and robotic welding cells. 15 manual welders on staff. Capital Robotics Fusion Arc 300L for production runs.

Finishing

Fully automated in-house powder coat line. Pretreatment, coating, and cure under the same roof as cut and weld.

Inspection

InspecVision P150.35 optical inspection and Keysense WM6000 CMM. First-article on every new part number.

Assembly & Test

Panel build, sub-assembly, hi-pot, megger, and continuity testing in-house. Documentation released with every shipment.

HOW A HYPERSCALE PROJECT RUNS AT SLM
A disciplined workflow tuned to data center schedules.

From NDA to first shipment in eight weeks or less on representative scopes. Every step owned by a named PM. Single point of accountability.

01

02

03

04

NDA & Scope Review

Mutual NDA executed. Drawings, specs, and BOM reviewed by engineering and operations together.

Quote in 48 Hours

Real numbers, real lead times. Commercial terms aligned to the owner or GC's procurement standards.

Pilot RFQ

Representative scope item awarded as a pilot to validate fit before full-program commitment.

Production & Test

Status updates against the agreed schedule. Hi-pot, megger, and dimensional inspection before release.

05

Coordinated Delivery

JIT delivery windows aligned to the site schedule. Field-fit modifications handled from Forney within a single driving day.

OUR PROMISE TO DATA CENTER BUYERS
When you call SLM you get a real shop, real craftsmen, and a real schedule. We quote what we can deliver, we deliver what we quote, and we tell you the truth in between. If something goes sideways you hear it from us first, with a plan to fix it.

SMART LASER MANUFACTURING · FORNEY, TEXAS

REQUEST A PROJECT QUOTE

Send drawings. Get a real number.

For data center procurement, EPC sourcing, and GC pre-construction teams. NDA on request. Engineering on the line for drawing-level questions.

RESPONSE TIME

Within 48 hours

NDA AVAILABLE

On request

FILE TYPES

PDF, DXF, STEP, IGS

Your Role
Project Capacity
Scope Type
Drop files here or click to upload PDF, DXF, STEP, IGS, ZIP up to 50MB total

More context means a sharper auote and a faster pilot.

Or email quotes@smartlasermfg.com directly.

bottom of page